Calcium mineral deposits had built up over years in this 250mm (10″) PVC pipeline and were removed with the ID-tec system.
The calcium broke loose in pieces as soon as the water blast penetrated the deposits and were removed with the jetter truck. The PVC host pipe remained untouched.